Ethiopia CPT NextGen FMAM_PRCP Models NCEP-CFSv2 Forecasts target_length: Length of forecast time data
target_length Length of forecast time from Ethiopia CPT NextGen FMAM_PRCP Models NCEP-CFSv2 Forecasts: Forecast and Error.
Independent Variables (Grids)
- Forecast Lead Time in Months
- grid: /L (months) ordered [ (3.0)] :grid
- S (forecast_reference_time)
- grid: /S (months since 1960-01-01) ordered (1 Sep 2019 - 24 Sep 2020) to (7 Dec 2023 - 30 Dec 2024) by 12.79999 N= 5 pts :grid
Other Info
- calendar
- 360
- CE
- null
- CS
- null
- datatype
- realarraytype
- missing_value
- NaN
- pointwidth
- 1.0
- units
- days
- standard units*
- 86400 second
- history
- Averaged in T with overlapping interval 4
Last updated: Mon, 15 Dec 2025 13:50:02 GMT